Removal of all existing plaster, sand blasted timber ceiling beams and removal of all existing York stone flags from floor. The electrics for new kitchen were all installed and complete new plumbing to accommodate new kitchen layout. Under floor heating installed running from central heating system before relaying existing natural stone floor onto new concrete screed.
The entire room was dry lined and skimmed with new plaster throughout and painted prior to installation of new softwood hand built kitchen. Fitted all kitchen units and new natural stone cooker surround with hand carved tudor rose details within each pillar. Gas liner installed to accommodate new Rayburn.
New upvc window installed and all finishings i.e skirting boards,doors and decorating throughout
Church road kitchen renovation. All areas of renovation requiring building inspector approval were signed off by building control giving certificates.